Project
Process Plant – ONGC Uran
SSIS was entrusted with the design, fabrication, and delivery of Storage Tanks for Bostik, a leading global adhesive solutions provider under Arkema Chemicals, for their Dahej Plant. This project was crucial in providing safe, reliable, and efficient storage solutions for the plant’s chemicals and raw materials.
Key Highlights of the Project:
- Client: Bostik (Arkema Chemicals), a global leader in adhesive solutions.
- Location: Dahej Plant, a major manufacturing facility for chemical products.
- Scope of Work: SSIS was responsible for the end-to-end development of the storage tanks, including design, procurement, fabrication, assembly, and installation.
- Tank Specifications: The tanks were designed to store a range of chemicals and raw materials, ensuring safety and durability under varying operational conditions.
- Materials and Construction: SSIS utilized high-quality materials such as carbon steel, stainless steel, and alloy materials for tank construction, ensuring resistance to corrosion and enhanced durability.
- Engineering Expertise: The tanks were designed to accommodate the specific needs of Bostik’s chemical storage requirements, with features such as pressure relief systems, level monitoring,
- Customization: The storage tanks were tailor-made to meet the specific requirements of Arkema Chemicals’ operations, ensuring optimal functionality and ease of integration into the existing infrastructure at the Dahej Plant.